Mr. Wright Flooring Inc. logo
Flooring Cost Guide for Jacksonville: What Shapes Your Quote

LVP Installation Cost: What Goes Into Your Quote

LVP installation cost depends on the plank and on what's under it: subfloor leveling, slab moisture, old adhesive, vapor barriers and trim. Here is what Mohawk's SolidTech instructions require.

Mr. Wright Flooring · Nov 18, 2026

Kitchen with white cabinets and a dark plank floor

LVP installation cost depends on the plank you choose and on what's under it: how flat the subfloor is, how a concrete slab tests for moisture, and what has to happen to the floor and glue that are there now. Trim and transitions add to the scope as well. Instead of publishing per-square-foot prices, Mr. Wright Flooring gives you a free in-home measure and estimate, and this guide explains what Mohawk's SolidTech instructions say shapes the job.

We're a family-owned flooring company in Jacksonville, serving Northeast Florida since 2012, and an authorized Mohawk retailer. We carry Mohawk's SolidTech rigid vinyl, so the rules below come from Mohawk's SolidTech installation instructions; other LVP products set their own. This guide is part of our flooring cost guide. If you're new to the category, start with what LVP flooring is, or see our luxury vinyl plank options.

A flat subfloor comes first

Mohawk's SolidTech instructions say any unevenness of more than 3/16 inch over a 10-foot span, or 1/8 inch over a 6-foot span, must be leveled out. Bumps are removed by sanding or scraping, and low spots are filled with a portland cement-based leveling compound.

An underlayment can't do that job for you. For wood subfloors, Mohawk says an underlayment can help provide a smooth surface but will not correct defects in the subfloor such as deflection, meaning a floor that flexes, or unevenness. It adds that structural work on the subfloor may be required before the flooring installation starts. Our guide to vinyl plank flooring underlayment covers what underlayment does and doesn't do.

Key takeaway

If the subfloor is out of flat, leveling is part of the job, and Mohawk says an underlayment on a wood subfloor is not a substitute for it.

Testing a concrete slab for moisture

On concrete, SolidTech has a moisture limit. Mohawk's instructions call for 8 pounds or less per 1,000 square feet per 24 hours on a calcium chloride test (ASTM F1869), or less than 90% relative humidity with in-slab probes (ASTM F2170), before, during and after installation. They call for one test for areas up to 1,000 square feet and one more for each additional 1,000 square feet, and a slab pH between 5.0 and 9.0.

Installer kneeling beside a toolbox

Mohawk puts the final responsibility for deciding whether the concrete is dry enough on the floor covering installer. Other floors use other numbers. Mohawk's laminated wood instructions set a tighter limit, which our guide to laminate installation cost explains.

For floating installations, Mohawk highly recommends a minimum 6-mil polyethylene vapor barrier with seams overlapped 8 inches and taped. Mohawk says the barrier should not be used to resolve moisture problems, which have to be handled by other means, and that cupping or peaking claims without a proper vapor barrier could be denied. For how Mohawk's water warranty language differs from moisture under the floor, read waterproof vs. water-resistant flooring.

Key takeaway

Ask how your installer will confirm the slab meets SolidTech's moisture limit, because Mohawk puts that call on the installer.

A floating SolidTech floor over concrete, top to bottom
  1. SolidTech plank

    Perimeter sealed with WetProtect molding system and 100% silicone sealant or PerimeterSeal.

  2. Vapor barrier (floating installs)

    Mohawk highly recommends minimum 6-mil polyethylene, seams overlapped 8 inches and taped; not for resolving moisture problems.

  3. Leveling compound (where needed)

    Out-of-flat areas leveled; low spots filled with portland cement-based compound, bumps sanded or scraped.

  4. Concrete slab

    Calcium chloride: 8 lb or less per 1,000 sq ft/24 hr; probes: under 90% RH; pH 5.0–9.0.

Source: Mohawk SolidTech installation instructions. Other LVP products set their own rules.

The floor and glue you have now

In many cases SolidTech can go over the floor you already have. Mohawk says it can be installed directly over most existing floor coverings, excluding carpet (including needle felt), floating laminate, floating floor systems, luan and cushioned vinyl.

Mohawk says the installer or flooring contractor on site is solely responsible for deciding whether an existing floor is suitable. If there is any doubt, the existing floor should be removed or an acceptable underlayment installed over it.

Old adhesive has two options in Mohawk's instructions. It can be mechanically removed by a licensed professional contractor, using methods such as bead blasting or scarifying, or it can be covered with a portland cement-based self-leveling underlayment. Mohawk says not to use chemical adhesive removers.

SolidTech over an existing floor: what Mohawk says

Most existing floors

SolidTech can be installed directly over most existing floor coverings.

Excluded floors

Carpet (including needle felt), floating laminate, floating floor systems, luan and cushioned vinyl.

If there is any doubt

Installer decides suitability; remove the old floor or install an acceptable underlayment over it.

Old adhesive

Mechanically removed by a licensed contractor, or covered with portland cement-based self-leveling underlayment.

Chemical removers

Mohawk says not to use chemical adhesive removers.

Source: Mohawk SolidTech installation instructions

Trim, transitions and sealed edges

Trim work is part of an LVP job. Mohawk's SolidTech instructions say to remove any existing floor molding. Removing wall baseboards is optional if quarter round is installed to cover the required expansion gap. All floor molding and transition strips must leave a 3/8-inch expansion space, and rooms with a run longer than 50 feet need a transition strip.

Living room with a gray sofa and a light plank floor

The edges are sealed as well. Mohawk requires the entire perimeter of a SolidTech installation to be sealed with its WetProtect molding system and 100% silicone sealant or PerimeterSeal, applied according to the installation instructions.

Mohawk also asks for SolidTech to acclimate in the room where it will be installed, at 55°F to 85°F, for 48 hours before installation, and for those temperatures to be kept before, during and after the job.

Key takeaway

Molding removal, transition strips and perimeter sealing are all written into Mohawk's SolidTech instructions, so they belong in the scope of the job.

How our LVP estimate works

You can buy LVP from us and have our crew install it, have us install flooring you bought elsewhere through our professional installation service, or buy it from us and install it yourself or hire your own crew. On every project we install, an experienced team leader supervises the work and keeps it inside the manufacturer's warranty guidelines.

If we supply both the material and the installation, the material is covered for 2 years and the installation for 2 years. If you supply the material and we install it, the material is covered for 1 year and the installation for 1 year from the installation date. Financing is available through Synchrony.

The subfloor, the slab, the old floor and the trim all shape what an LVP job involves. To see what your rooms need, request a free estimate and we'll measure your home at no charge, or call (904) 443-9473. You can also compare the lines we carry on our Mohawk flooring page.

Frequently asked questions

How much does it cost to install LVP in Jacksonville?

It depends on your rooms and what the job needs: leveling a subfloor that is out of flat, moisture testing and a vapor barrier on a concrete slab, dealing with the old floor or adhesive, and trim and transitions. Instead of publishing per-square-foot prices, Mr. Wright Flooring gives you a free in-home measure and estimate based on your rooms and the plank you choose.

Can LVP go over my existing floor?

Often, depending on the floor. Mohawk says its SolidTech vinyl can be installed directly over most existing floor coverings, excluding carpet (including needle felt), floating laminate, floating floor systems, luan and cushioned vinyl. Mohawk leaves the decision to the installer on site, and it says that if there is any doubt, the old floor should be removed or an acceptable underlayment installed over it.

Does LVP need a moisture test on a concrete slab?

For Mohawk's SolidTech, yes. Its instructions call for 8 pounds or less per 1,000 square feet per 24 hours on a calcium chloride test, or less than 90% relative humidity with in-slab probes. Mohawk asks for one test for areas up to 1,000 square feet plus one for each additional 1,000 square feet, and a slab pH between 5.0 and 9.0. The installer has the final say on whether the slab is dry enough.

Will an underlayment fix an uneven subfloor?

No, according to Mohawk. For wood subfloors, its SolidTech instructions say an underlayment can help give a smooth surface but will not correct subfloor defects such as deflection or unevenness, and that structural work may be needed first. Unevenness of more than 3/16 inch over 10 feet, or 1/8 inch over 6 feet, must be leveled by sanding or scraping bumps and filling low spots with a portland cement-based leveling compound.

What happens to old glue on the slab before LVP goes down?

Mohawk's SolidTech instructions give two options for old adhesive, including asphalt-based cut-back. It can be mechanically removed by a licensed professional contractor, using methods such as bead blasting or scarifying, or it can be covered with a portland cement-based self-leveling underlayment. Mohawk says not to use chemical adhesive removers. Ask how your estimate handles it.

Can you install LVP I bought somewhere else?

Yes. Our professional installation service covers flooring you bought elsewhere, and we will install anything you supply and talk you through its quality. When you supply the material and we install it, the material is covered for 1 year and the installation for 1 year from the installation date. If we supply both the material and the installation, both are covered for 2 years.

Thinking about new floors?

The same crew, still family-owned. Free in-home estimate across Jacksonville and Northeast Florida.